Skip to content
Aqua

Engineering and assembly operations

Holding line manning through volume swings and changeovers

Location
India
Duration
Ongoing deployment
Service scope
ITI and non-ITI production manpower

The challenge

Absenteeism on individual stations was holding output, and each ramp-up restarted the sourcing cycle from the beginning. Skill category was not consistently matched to the station before deployment.

Aqua solution

Aqua introduced skill mapping ahead of deployment, buffer planning for critical stations, and replacement management so a gap is covered within the shift rather than at the next roster.

Mobilisation & process

Trade requirements were mapped station by station, induction and safety orientation were standardised, and shift supervisors began coordinating manning against the production plan at every changeover.

Measured outcome

Production and HR teams work from a shared view of manning against plan, and headcount scales with the production schedule without restarting sourcing each cycle.

Scope

    ITI and non-ITI production manpowerassembly-line workforcematerial handlingwarehouse support

Equipment deployed

PPE issue and tracking, station readiness checks

Related capability

ITI & Non-ITI Production Manpower

Skilled, semi-skilled and general plant manpower deployed to the shift plan your line runs on.

Explore capability

Similar requirement

Have a comparable operation to solve?

Share the site, the scope and the constraint you are working against. Aqua will propose the operating structure around it.

Back to all projects